Main
|
Objectives
|
Technical Approach
Workpackages
|
Expected Impact and Applications
|
Participants
Documents
|
Internals
|
Contact
Main
Objectives
Technical Approach
Workpackages
Expected Impact and Applications
Participants
Documents
Deployable Hardware/Results
Internals
Contact
Deliverables
D1
Implementation of web based resource and communication platform
D2
Market analyses in area of smart factories, interactive guiding and high speed WLAN
D3
Characterisation and modelling of radio channel
D4
Definition of architecture, link budget and specifications for the components
D5
Design of BS transmitter including linearisation and smart power control of power amplifier
D6
Design of BS receiver
D7
Design of BS synthesiser
D8
Assembling of ASIC and FPGAs on BB board
D9
Design of Reflector on advanced CMOS
D10
Assembling of BS Frontend
D11
Development and Implementation of Algorithms for Local Positioning
D12
Design of Antennas and Antenna Arrays
D13
Assembly and Design of Complete System
D14
First Testing of System
D15
Redesign of BS Frontend and Reflector
D16
Optimised Antennas and Antenna Arrays
D17
Redesign of System and Testing (revised)
Amendment: 3D position measurement
D18
Design and Testing of Demonstrator for Smart Factories
D19
Design and Testing of Demonstrator for Interactive Guiding
D20
Preparations for potential market launches (confidential document)
D21
Project Management
D22
Organisation of Workshop
unscheduled
RESOLUTION White Paper
©
2006 RESOLUTION
|
Imprint
|
Feedback/Support
| 26.02.2009